Desert Star Camp
12 × SC-30 space capsules arranged along a curved boardwalk, plus one MU-40 reception module. Shipped on 12 flat racks, crane-installed and commissioned in 6 weeks on site.

Capsule camps, glamping resorts and modular lodges delivered as one-stop packages — planned in our office, finished in our factory, opened on your land.
12 × SC-30 space capsules arranged along a curved boardwalk, plus one MU-40 reception module. Shipped on 12 flat racks, crane-installed and commissioned in 6 weeks on site.
8 × SC-30 capsules on steel-stilt foundations following the hillside contour. Full camp MEP planning, cable routing and septic solutions delivered by our engineering team.
18 × AC-18 apple cabins on timber platforms plus 4 × GC-24 honeymoon suites. Two units per 40HQ kept sea freight within the investor's target budget.
14 × GC-24 glamping suites with outdoor bathtub decks, plus MU-20 staff and laundry modules. Camp opened for the autumn high season, 45 days after vessels departed.
A two-storey villa assembled from 4 × MU-40 modules — living room, three bedrooms, two bathrooms and roof terrace, installed and watertight in 3 days.
Foundations and utilities are prepared while vessels are at sea. On site, each cabin is crane-placed, levelled and connected — most camps are guest-ready within 1–2 weeks of arrival.
Delivery Scope
Camp master plan, unit mix, 3D renders, foundation & utility drawings, export documentation, marine insurance.
FCL booking, loading supervision, photo reports before container closure, customs documents, DAP/DDP options.
Installation guidance (on-site supervisor optional), water & power connection, commissioning, staff training video call.
Your Project Next
Photos, coordinates or a rough sketch are enough to start. We reply with a layout proposal and quotation within 24 hours.