Why developers, resort operators and campsites around the world choose factory-built Unit Cabin products over site construction.
Six Reasons
Hard finishes, sanitary ware, kitchen, furniture and appliances are installed on our production line — under QC, in dry conditions, with photo reports at every station. Nothing critical is left for your site.
Bed, wardrobe, AC, water heater, lighting, curtains and kitchen equipment are part of the build. Your cabins arrive as guest-ready rooms — no shopping list, no local fit-out crew.
Cabins ship complete on flat racks or in 40HQ containers. One crane lift puts each unit on its foundation — no assembly crews, no scaffolding, no months of site works.
Single-point utility connections and pre-commissioned systems mean a cabin can welcome guests the same day it is placed. Most camps open 1–2 weeks after containers arrive.
CE (EN 1090), ISO 9001 and ISO 14001 systems, SGS structural and fire testing. Documents accepted by customs and hospitality investors worldwide.
From one cabin to 100+ units, the same production line and QC standard apply. One supplier, one contract, one responsible partner for the whole camp.
The Numbers
| Factor | Unit Cabin Prefab | Traditional Site Build |
|---|---|---|
| Schedule (10-unit camp) | ≈ 45 days factory + 1–2 weeks on site | 6–12 months, weather dependent |
| On-site labour | Crane crew + 2 workers per cabin | Full construction crews for months |
| Quality control | Factory QC, water & circuit tests, photo reports | Depends on local contractors |
| Budget certainty | Fixed contract price incl. furniture | Frequent variation orders |
| Site disruption | Minimal — land untouched except foundations | Heavy machinery, noise, waste |
| Relocation | Cabins can be lifted and moved | Permanent |